I want to restructure the current Lead Scoring system of my company. However, because this will be done as an experiment, I do not want to delete or overwrite the existing Lead Score. Since many aspects of our current solution will be the same or just slightly changed it would be great if I could create a copy of the existing Score to start working from there, so I do not have to set up everything from the beginning.
Anyone knows if and how this is possible? Thanks in advance 🙂