In the current settings for a Deal-based “Based on a schedule” workflow with re-enrollment enabled, the UI says that eligible Deals can re-enroll at scheduled times after completing the workflow. It also says that a Deal already enrolled at the scheduled date and time will not re-enroll and will continue from the last completed action.
In a controlled check, one manually enrolled run stayed active across the configured daily time. Around that time, native history recorded an exclusion because the record was already enrolled. The original run later completed, and no separate catch-up admission was visible in the inspected history during a bounded follow-up. This does not establish scheduler internals or a general catch-up guarantee. The next regular daily admission is still pending. No source data was intentionally changed during this check.
Could you clarify the remaining behavior for this separate source-change scenario?
- A Deal is enrolled and source data changes while its run is active.
- A scheduled time occurs before that run finishes, so the UI-described exclusion from re-enrollment applies.
- The run finishes. At the next regular scheduled time, the Deal still meets the filters, with no further source change.
- Will that next regular occurrence re-enroll the Deal for a new evaluation of its current state? Are any conditions required beyond re-enrollment being enabled and having the required recurring-schedule entitlement?
- What happens to the occurrence missed during the active run after that run exits: is it discarded, deferred for catch-up, or combined with a later occurrence?
- Do failed or retrying runs keep the Deal enrolled, and when does it become eligible for a later scheduled enrollment?
Please distinguish the existing run continuing from its last completed action, any deferred catch-up, and a new enrollment at the next regular scheduled time. A documented lifecycle or supported configuration would help.
Official references:
Scheduled workflow enrollment
Workflow re-enrollment
Good scenario to pin down, because the native behavior here is “skip, never queue.”
1. Next regular occurrence after the run finishes: yes, it re-enrolls. Once the run fully exits (completes or is unenrolled), the deal meets the filters again at the next scheduled time and enrolls for a fresh evaluation of its current state — as long as re-enrollment is on and the portal has the recurring-schedule entitlement. The “continue from the last completed action” wording only applies to the same run surviving across a scheduled time. A new enrollment always starts a new run from action 1.
2. The missed occurrence is discarded, not deferred. “Based on a schedule” enrollment is a point-in-time evaluation. If the deal is ineligible at that exact moment (already enrolled), that evaluation is skipped — there is no documented catch-up queue, which matches your observation that no catch-up admission appeared in history. Your controlled check is strong evidence of this.
3. Failed or retrying runs keep the deal enrolled. A run that failed and is retrying still counts as an active enrollment, so the deal stays ineligible for re-enrollment until the run fully exits (completes, fails terminally with no retry left, or is manually unenrolled). Eligibility returns at the next scheduled time after that.
Practical takeaway from building schedulers outside HubSpot too: native scheduled enrollment has no per-occurrence ledger, so a silent skip is the designed behavior, not a bug. If you need guaranteed processing per occurrence (no silent skips), move the schedule out of HubSpot — e.g., an n8n Schedule trigger that searches deals by your filters each run and stamps a last_processed_at custom property as an idempotency key. Then you decide whether a missed occurrence is skipped or caught up, instead of inferring it from workflow history after the fact.
Thanks, Farzam. I have now completed the next-day check, which is consistent with your explanation of enrollment at the next regular scheduled time.
On October 7, a new enrollment occurred at 13:00:24.253 UTC, and its native source explicitly identified it as part of a scheduled run. Its 30-minute delay and workflow both completed successfully at 13:30 UTC, as displayed to minute precision. I then manually turned the trial workflow off at 13:45 UTC and verified OFF after reload, an empty delay table, and only the two expected admissions in the inspected history.
No source data was intentionally changed, and the returned Deal snapshots matched the baseline. The graph contained only a delay followed by completion. This checks the next regular admission for the unchanged Deal; it does not test changed-source evaluation or failure/retry handling. The bounded history checks also cannot establish every possible catch-up behavior.
Could you point me to the official documentation or supported lifecycle reference for these two parts of your answer?
- A scheduled occurrence skipped while the Deal is already enrolled is discarded, with no later catch-up for that occurrence.
- The exact point at which a failed/retrying run ceases to count as enrolled, particularly after retries are exhausted, and becomes eligible at a later scheduled time.
That would help distinguish the supported contract from what this small trial actually observed.